Migrate · 48 hours

Move without losing your list, number or templates.

Eight cutover playbooks. Suppression lists first, DNS last, 72-hour rollback window.

Done for you

Free migration

Contacts, templates, automations and WhatsApp number. 48 hours typical.

Two wooden crates on a concrete loading bay floor, one open and half filled.
From Mailchimp

Migrate from Mailchimp

Contacts, templates, automations and suppression lists move in a fixed order, with the sending domain authenticated before DNS is switched.

Read the playbook
A stack of flat-packed cardboard on a concrete floor, tape roll beside it.
From Brevo

Migrate from Brevo

Email, SMS and CRM data consolidate into one workspace billed in INR, with opt-out and bounce state preserved through the attribute mapping.

Read the playbook
A wooden crate with rope handles on a stone floor, lid ajar.
From Zoho Campaigns

Migrate from Zoho Campaigns

Zoho CRM stays connected through the native integration while campaigns, templates and unsubscribe state move to a domain you authenticate.

Read the playbook
A metal filing drawer pulled out, folders rising above the rail.
From SendGrid

Migrate from SendGrid

Transactional templates, webhooks and event consumers are rebuilt and tested trigger by trigger, with warm-up before marketing traffic follows.

Read the playbook
A single suitcase open on a bed, folded cream shirts inside.
From Klaviyo

Migrate from Klaviyo

Shopify catalog sync is verified first, then abandoned cart, welcome and post-purchase flows are rebuilt and measured against the old baseline.

Read the playbook
A rolling shelf half emptied, one binder left on the middle tier.
From HubSpot

Migrate from HubSpot

HubSpot can remain the CRM while campaign execution moves out; contacts sync with lifecycle stage and consent instead of being duplicated.

Read the playbook
A hand trolley loaded with two strapped boxes in an empty corridor.
From AiSensy

Migrate from AiSensy

Display name and template approvals travel with the number when the BSP changes, so the opt-out list has to land before any send.

Read the playbook
A pallet wrapped in film in a bare loading bay, cold light.
From Interakt

Migrate from Interakt

WhatsApp automations and Shopify flows are rebuilt before the number moves, so existing template approvals survive the cutover.

Read the playbook
An empty shelving unit in a bare room with one box left behind.

The short version

  • A migration moves four things at different speeds: contacts and consent in an afternoon, templates in a few days, automations over one to two weeks, and send history not at all.
  • Suppression loading comes before the first campaign, not after it. Importing a clean list and then mailing it is the single most common way a switch damages a domain.
  • Domain authentication, WhatsApp template re-approval and TRAI DLT registration are the three queues outside anyone’s control. Start them on day zero and plan around them.
  • Budget one overlapping billing month. Keep the old platform active and read-only for 72 hours after cutover; cancel on day four, not on cutover night.
  • LoopNow imports contacts, custom fields, consent state, suppression lists, templates and your WhatsApp number. It does not import another vendor’s campaign history, event logs or lead scores.
  • The quick path is real: a clean list with an already-authenticated domain can be live in about 48 hours. The full path, with automations rebuilt and verified, is closer to two weeks.

What a platform migration actually moves

People describe a migration as a copy, and that description is where most projects go wrong. What is really happening is that four different assets move at four different speeds, and only one of them behaves like a file transfer. Contact records and consent flags move quickly because they are rows in a table with a known shape. Message templates move more slowly because each one has to be rebuilt in a new editor and, on WhatsApp, sent back through an approval queue that belongs to Meta rather than to either vendor. Automation logic moves slowest of all, because an automation is a decision tree that has absorbed two years of small corrections, and those corrections live in the head of whoever built it.

The fourth asset does not move at all. Send history, per-recipient event logs, deliverability reputations attached to a specific IP, A/B test results, lead scores and internal notes held against a campaign are all tied to the platform that produced them. You can export some of it as CSV for your own records, and you should, but you cannot load it into a new system and expect it to mean the same thing. A migration plan that promises to preserve reporting continuity is either misunderstanding the problem or selling you something. Plan to start reporting from the cutover date and keep the old dashboard as an archive for the quarter.

The four assets of a migration, showing contacts and consent, templates, automation logic and send history attached to the runtime at different levels of portability. LoopNow runtime Contacts and co… Moves in an afte… Templates Rebuilt, then re-approved Automation logic Rebuilt by hand Send history Stays behind as archive
Figure 1. Three of the four assets can be moved with work. The fourth, send history, stays with the platform that produced it and is only ever an export for your records.

This is why the honest shape of a migration is a sequence of checkpoints rather than one long task. Each checkpoint has a pass condition you can state in a sentence: the suppression list is loaded and matched, the domain passes authentication, the seed test lands in the inbox at three providers, the first rebuilt automation produces the same outcome as the old one on a fixed test case. If a checkpoint fails, you stop and fix it before the next one starts, because every later step assumes the earlier one held. That discipline is worth more than any tool.

The four inventories to take before you touch anything

Every migration that runs late skipped the inventory. The inventory is not a spreadsheet of contact counts. It is four lists that answer the question of what you currently depend on, written down by someone who has actually used the account in the last month. The first list is people: how many contacts, which fields, which of those fields are used in a template or a segment, and how many are unsubscribed or suppressed. The second is content, meaning every template and campaign that is still in rotation, with the variables it expects and who owns it.

The third list is behaviour, and it is the one teams underestimate. Write down each automation with three facts attached: what triggers it, what it sends, and what would visibly break in the business if it stopped. That third column is how you decide what must be rebuilt before cutover and what can wait in a backlog. The fourth list is plumbing: sending domains and subdomains, every DNS record that touches mail, API keys and who holds them, webhook endpoints and the systems behind them, any dedicated IP, and the person who can change DNS at nine on a Monday morning without filing a ticket.

An inventory worksheet with columns for asset, owner, still in use, exportable and rebuild effort. Contacts + fields Live templates Automations live Domains and DNS Keys and webhooks
Figure 2. The inventory sheet, in the order it should be filled. The rebuild column is what turns a wish list into a schedule.

Take the inventory in the vendor dashboard rather than from memory, because memory is generous about what is still running. Anything you cannot see and cannot export, write down as unverified and plan to check by sending a test through it. The inventory takes an afternoon for a small account and two days for one with a decade of accumulated campaigns. It is the cheapest part of the project and the only part that makes the estimate credible.

Deciding whether to migrate at all

Not every account should move, and a migration guide that cannot say so is a sales document. There are clear cases where staying is the better decision. If you need a very large global template library and a mature drag-and-drop editor, a specialist email product will serve you better than a runtime that treats email as one channel among five. If your work is entirely WhatsApp broadcasts with a simple chatbot and price is the deciding factor, a single-channel platform with a lower entry point is the rational purchase. If procurement requires European data residency and a GDPR-first paper trail, a platform built around that requirement is the lower-risk answer.

The case for moving is usually not about a missing feature. It is about the cost of the seams between tools: three consent states that disagree, a CRM that never learns what happened on WhatsApp, a report that has to be assembled by hand every Monday. Those seams are invisible on a pricing page and expensive in payroll. If your team spends a day a week reconciling channels, the migration is really an integration project and should be judged on that basis rather than on a per-message price comparison.

A decision tree asking whether the CRM should move, branching into full replacement, execution-only migration and staying put. Does the system of record need to move too? decision Full replacement Longest, riskiest Execution only Keep CRM, move channels Stay put Fix the seams instead
Figure 3. The scope question comes before the vendor question. Most teams that answer execution-only finish in half the time with most of the benefit.

There is also a middle path that many teams should take and few consider: migrate the execution layer and leave the system of record alone. Keep the CRM you already pay for, move campaigns, WhatsApp and voice onto the new runtime, and connect the two with a sync instead of a data migration. That halves the risk, keeps the sales team’s pipeline intact and usually gets you most of the benefit. We recommend it more often than a full replacement, including when the CRM is a competitor’s product.

The working plan, day by day

A realistic small-account plan fits in ten working days and has five checkpoints. Day zero is access and inventory: create the new workspace, invite the two people who will actually run it, take the four inventories, and start the three queues that depend on other people. That last item matters more than the rest, because Meta template review, TRAI DLT registration and DNS propagation all run on someone else’s clock, and starting them on day six is how a ten-day plan becomes a three-week plan.

Days one and two are data. Export contacts with every field you intend to keep, map the fields into the new schema, and load the suppression list first as a separate step so you can prove it matched. Then load contacts in batches small enough that a mistake is recoverable, and spot-check twenty records by hand against the source. Days three to five are content and identity: authenticate the sending domain, rebuild the templates that are actually in rotation, and rebuild the first automation end to end with a fixed test case that produces a known outcome.

A ten working day migration plan from access and inventory through cutover and the seventy-two hour watch. Day 0 Access, inventory, start approvals Meta, DLT and DNS queues opened Days 1-2 Export, map, load suppression Match rate checked by hand Days 3-5 Authenticate domain, rebuild templates Seed test to three providers Days 6-8 Rehearse first automation Fixed test case, known outcome Days 9-10 Cutover, then 72-hour watch Old platform read-only, not cancelled
Figure 4. The ten-day shape. Days zero through two are reversible, which is why the irreversible work sits at the end.

Days six to eight are rehearsal. Run a seed test to Gmail, Outlook and a Rediff or Yahoo address, because Indian consumer inboxes behave differently from corporate ones. Send a real campaign to an internal list of staff and one friendly customer. Replay a webhook into the downstream system and confirm the record lands where the sales team expects it. Days nine and ten are cutover and watch. The full sequence with pass conditions is below, and the version with automations rebuilt rather than duplicated is closer to two weeks.

Domain authentication decides your week

If you send email, the domain is the project. Authentication is not a LoopNow-specific setting; it is the set of DNS records that tell receiving providers your mail is allowed to carry your name. You need a DKIM key published at a selector, an SPF record that authorises the new sender without exceeding the ten-lookup limit, and a DMARC policy that tells providers what to do when both fail. Get the order wrong and your first campaign lands in spam while everyone blames the new platform.

The safe sequence is boring and it works. Lower the TTL on the records you are about to change to five minutes and wait for the old TTL to expire. Publish the new DKIM key on a subdomain you control, verify it with a test send, then add the new sender to SPF, then move DMARC to p=none with a reporting address you actually read. Only after a week of clean reports should you tighten to quarantine. Never delete the old DKIM record on cutover night; leave it for a month so in-flight mail still validates.

The order of DNS changes for a new sending domain, from lowering TTL through DKIM, SPF and a monitoring DMARC policy. 1 Lower TTL to 300 2 Publish new DKIM 3 Add SPF sender 4 DMARC at p=none 5 Read reports weekly
Figure 5. The order matters more than the speed. Each step is verifiable before the next one starts.

The most expensive mistake is editing the root domain’s mail records when you only meant to change marketing mail. If your company email runs on the same root domain, send marketing from a subdomain such as mail or news, authenticate that subdomain separately, and leave the root MX and SPF untouched. This costs one extra DNS zone and saves you an outage in which nobody in the company can receive email. Write the record changes down before you make them, and have a second person read them.

The two approval queues you cannot skip

Two of the items on your critical path do not belong to LoopNow or to your current vendor. The first is Meta’s template review for WhatsApp. Templates are reviewed against category rules, and the category determines both the price and the rejection risk. A message that reads like a promotion but is submitted as utility will be reclassified or rejected, and a rejected template blocks the campaign that depends on it. Submit early, submit the exact variables you will use, and expect at least one round of edits on a large library.

The second is TRAI’s DLT regime for SMS. Commercial SMS in India has to be sent against a registered header and a registered template, and the registration happens through a portal operated by the telecom ecosystem rather than inside your marketing tool. If you have never sent SMS from your own header, this is a three-to-seven day task you cannot compress by paying more. If you already have a registered header, confirm the new sender is permitted to use it and that the template IDs will still resolve.

The external approval and configuration surfaces a migration depends on, with rough durations for each queue. Meta template review Hours to days TRAI DLT portal 3 to 7 days Domain registrar Minutes to change DNS propagation TTL dependent BSP number transfer Days, verify first GST billing profile Same day
Figure 7. Four of these are outside your control and one is a five-minute change. The plan has to reflect that asymmetry.

Plan the rest of the project around these two queues rather than in parallel with them. The tempting move is to schedule cutover for the day the data is ready, then discover that the template the whole campaign depends on is still in review. Put the approval start date on day zero, keep a list of which templates are approved, pending and rejected, and treat a rejection as a content problem to solve rather than a vendor problem to escalate. Neither Meta nor TRAI has a support line that responds to urgency.

Billing, GST and the month you pay twice

Every migration has one month where two invoices arrive and only one of them is producing revenue. Budget for it openly instead of discovering it in a finance review. The old platform’s billing cycle rarely aligns with your cutover date, and cancelling early to save a few thousand rupees is how teams lose the rollback option they end up needing. Keep the old account on its cheapest viable plan through the overlap, then cancel once the new sender has run cleanly for a week.

On the LoopNow side, prices are in rupees and exclusive of eighteen percent GST, with a GSTIN invoice on every payment and payment by UPI, netbanking, card or NEFT for annual plans. If you are registered, that GST is input credit rather than a cost, but only if the invoice carries your correct GSTIN and legal name, so fix the billing profile before the first payment rather than after it. Annual billing carries a twenty percent discount and a twelve-month price lock, which is worth taking only once you have run a full quarter and know your real volumes.

A bar chart of monthly email allowances included in each LoopNow plan, from five thousand on Free to five hundred thousand on Scale. Free 5000 emails Starter 25000 emails Growth 100000 emails Scale 500000 emails
Figure 8. Monthly email allowance by plan, before overage at three paise per delivered email. Model the festive peak, not the average month.

Watch the allowance rather than the sticker price. Overage is billed at the published rate, which for email is three paise per delivered message and for voice two rupees twenty per connected minute, and the spend cap is on by default so a runaway campaign stops instead of producing a surprise invoice. A team that sends a large festive campaign in one week can exceed a monthly email allowance without doing anything wrong, so model your peak week rather than your average month before choosing a plan tier.

Rollback: write it before you need it

A rollback plan is not pessimism, it is the thing that lets you cut over on a Thursday afternoon instead of waiting for a quiet weekend that never comes. Write down four facts before cutover. Which DNS records change and what their exact previous values were. Which API keys or webhook URLs move and who holds the old ones. Where the suppression snapshot lives, with a timestamp. And what the old platform will still let you do once you stop sending from it, because most vendors keep data readable for a period and almost none keep it sendable indefinitely.

The practical rollback is rarely a full reversal. If the new sender is producing bounces on one domain while the rest is clean, you fix the domain rather than abandoning the migration. If WhatsApp templates are stuck in review, you keep the old BSP sending that one campaign and move the rest. Partial rollback is normal and should be designed in: keep the old sending path warm for the channels that are still transitioning, and define in advance which single metric would trigger a reversal rather than an argument at midnight.

A comparison of rolling back and rolling forward after cutover, listing what each option costs in time and risk. Roll back Roll forward • Old records still intact• Costs a second migration later• Only viable inside 72 hours• Needs old keys kept live• Reassures a nervous team • Fix the failing domain or template• Keeps new consent records• Normal after day four• Needs an owner with authority• Cheaper once volume builds
Figure 9. After the first seventy-two hours the cheaper option stops being the left-hand column. Decide which column you are in before you start.

The line that ends the rollback window is not arbitrary. After seventy-two hours, enough mail has been sent from the new domain and enough replies have landed in the new inbox that going back costs more than fixing forward. Publish that line to the team at the start, along with the name of the person who can call it. A migration with no stated rollback window tends to acquire one by accident, three weeks later, when someone re-enables an old automation and half the list gets a duplicate message.

Post-cutover checks for the first 72 hours

The cutover is not the finish line, it is the start of the only period where problems are cheap to fix. Work through a fixed checklist rather than waiting to feel that something is wrong. Send the seed test again from the live configuration, not from the test configuration, and check that it lands in the inbox at Gmail, Outlook and one Indian consumer domain. Confirm the DKIM signature validates and DMARC passes, because a record that verified in staging can still be wrong once the live selector is used.

Then check the boring plumbing that nobody enjoys testing. Does an unsubscribe actually stop the next send, and does it write back to the CRM or only to the new platform. Do click and UTM parameters survive into analytics, or is every visit now attributed to direct. Do webhooks fire once rather than twice, and does a failed delivery retry instead of vanishing. Does the WhatsApp quality rating hold, and are template replies landing in the shared inbox rather than a single agent’s screen. Each of these is a five-minute check and a two-day repair if found late.

The LoopNow agent console showing run history, channel outcomes and an approval queue after cutover.
Figure 10. Run history in the agent console is where the first three days get checked. Each row is one trigger, one decision and one written outcome.

Keep a written log for the three days: volume sent, bounce rate by domain, complaint count, unsubscribes, replies, and anything a human flagged. A short log is what turns an argument about whether the migration worked into a comparison against the old baseline. At the end of the window, archive the old account’s exports somewhere your team can reach without a login, cancel the old plan, and write a one-page note on what you would do differently. That note is worth more to the next migration than any vendor documentation.

What takes an afternoon and what takes two weeks

Effort estimates for migrations are usually wrong in the optimistic direction because they describe the data move and not the rebuild. Be concrete about the split. Loading a clean contact list with mapped fields and a suppression list is an afternoon for a few thousand records and a day for a large account, provided the source export is tidy. Publishing DKIM and SPF records is twenty minutes of work plus whatever propagation takes. Creating a workspace, inviting the team and setting a billing profile with a GSTIN is under an hour.

The expensive items are the ones with human judgement inside them. Rebuilding a template library of forty pieces is several days even with a good editor, because each one needs its variables checked and its copy read. Rebuilding the automations that matter takes one to three days each if they are simple, and closer to a week if they branch on CRM state, wait for a human, or call an external API. Writing consent evidence that will survive an audit is a project in itself for an account that never recorded it. None of this is LoopNow-specific; it is the cost of the logic you already own.

A timeline separating tasks that take an afternoon from tasks that take two weeks during a platform migration. Afternoon Load contacts, fields and suppression Tidy export, mapped once One day Authenticate a sending domain Records plus propagation Three days Rebuild a template library Forty pieces, variables checked One week Rebuild one complex automation Branches, waits, external calls Two weeks Full cutover with reformatted logic Includes the 72-hour watch
Figure 11. The split that estimates usually hide. The left column is data; the right column is judgement and is where schedules slip.

Say plainly what cannot be imported, because a failed expectation costs more trust than a limitation. LoopNow cannot import another platform’s campaign history, per-recipient event stream, lead scoring model, A/B test results or the internal notes attached to them. It cannot bring across a dedicated IP’s reputation, and no vendor can. It cannot recreate a proprietary chatbot builder’s exact flow graph, only the behaviour you describe and it rebuilds. Anything you cannot find in an export is not a migration item; it is a rebuild item, and it should be scheduled as one.

Frequently asked questions

How long does a migration actually take?

A clean contact list with an already-authenticated sending domain can be live in about 48 hours, which is the figure most vendors quote. That covers data, domain and a first campaign. Rebuilding automations, re-approving a WhatsApp template library and completing DLT registration is closer to two weeks of elapsed time, most of it waiting on external review rather than on work.

What can LoopNow import from another platform?

Contacts, custom fields, consent state, unsubscribe and suppression lists, templates as content to rebuild, and your WhatsApp Business number through a BSP transfer. WhatsApp templates have to be resubmitted because approval belongs to Meta. Anything not present in an export, such as campaign history or lead scores, cannot be imported and should be treated as a rebuild item.

Do I have to move my CRM as well?

No, and usually you should not. Keeping HubSpot, Zoho, Salesforce or Freshsales as the system of record and moving only campaigns, WhatsApp and voice is the lower-risk path. It halves the data work and keeps the sales team’s pipeline untouched. LoopNow connects to the CRM rather than requiring you to replace it.

When should the suppression list be loaded?

Before any contact is mailed, and as its own step so you can verify it. Load unsubscribes, hard bounces, complaints, manual blocks and erasure requests first, then load contacts, then run a match report. If nothing matches on an account with years of history, the import is wrong. Mailing a freshly imported list without suppression is the most common cause of deliverability damage during a switch.

What happens to my WhatsApp templates?

They are rebuilt and resubmitted to Meta for approval, with the same category and the same variables. The approval decision belongs to Meta, not to either vendor, so no migration can preserve an approval it does not own. Keep the old template IDs on hand during the transition, because messages already in flight may still reference them.

Can I run both platforms at the same time?

For email, yes, and you should for a short window while you compare results. For WhatsApp, a number can only be attached to one Business Solution Provider at a time, so parallel running means a separate test number rather than the production one. Plan the number transfer as an ordered step with a verification checkpoint, not as a background task.

Is my data stored in India?

LoopNow runs on AWS Mumbai, ap-south-1, which is the residency position most Indian buyers are asked to evidence. If your own obligations require a specific region, private VPC or a signed data processing agreement, that is an Enterprise conversation. Ask for the sub-processor list and read it before you sign rather than after.

What does the migration cost?

Migration help is included rather than priced as a professional services line, and you pay only for the plan you run on. The real cost is the overlapping month where two platforms are billed and the internal hours spent rebuilding automations. Budget one month of double billing and between five and fifteen working days of somebody’s time, depending on how much automation you own.

How do I handle GST invoices during the overlap?

Set the billing profile with your legal name, address and GSTIN before the first payment, so the invoice is claimable as input credit rather than a cost. Keep both vendors’ invoices for the overlap month. If you switch to annual billing for the twenty percent discount, do it after a quarter of real volume so the tier matches your peak week.

What is the single biggest cause of a failed migration?

Sending before suppression is loaded, usually because the data move looked finished and the team wanted to prove the new platform worked. The second most common is changing root domain mail records when only marketing mail needed to move. Both are process failures rather than product failures, and both are prevented by a written checkpoint that someone other than the sender signs off.

Sources and further reading

  1. LoopNow pricing and plan allowances
  2. LoopNow DPDP compliance and consent records
  3. LoopNow WhatsApp Business API
  4. MeitY — Digital Personal Data Protection Act
  5. Telecom Regulatory Authority of India — DLT
LoopNow AI Answers from published LoopNow pages
Hi — ask me about LoopNow products, pricing, DPDP or migration. I answer from the published site and can connect you to the team.
Contact page